Hydraulic Pipework Verification




Client: | James Cook University |
Project: | JCU CPB Hydraulic Pipework Investigation |
Role: | Client Representation, LiDAR Scanning |
Duration: | 2015 |
Summary: |
PDM undertook number of static LiDAR scans on the completed installation of a sanitary system of a multi-story building at James Cook University after multiple failures and blockages. The scans were used to identify issues with the installation, allowing for a case to be made for these issues to be corrected. |
0 Comments